Place (2612) Table Support flush to the notched out ends of (2611) Table Top and attach with 4 (S7) Pan Screws.

Place Table Top Assembly tight in the opening of Back Wall with the overhang on the outside of the assembly as shown in fig. 17.2 and in the Glee Fort Guide then attach (2612) Table Support to the Back Wall posts with 2 (S3) Wood Screws.


Kitchen Counter

Flush to each end and top of (2687) Counter Back attach one (5736) Counter Joist per end with 1 (S2) Wood Screw per joist. At the bottom of the counter back notice the remaining holes

Place the other two (5736) Counter Joists over the pilot holes in the middle of Counter Back, flush to the boards top, then attach the top holes, with one (S2) Wood Screw per joist.

Place the Counter Assemblies (2687) Counter Back, flush to the top of the opening attaching with five (S2) Wood Screws.

Place one (6136) Counter Brace flush to the outside front edge of each outer counter Joists tight to the Swing Wall and attach with two (S3) Wood Screws per brace.

Place the Counter Assemblies (2687) Counter Back, flush to the top of the opening attaching with five (S2) Wood Screws.

Place one (6136) Counter Brace flush to the outside front edge of each outer counter Joists tight to the Swing Wall and attach with two (S3) Wood Screws per brace.

Place (2686) Counter Front against Counter Joists so the ends are flush and the centre counter joists are centred over the pilot holes. Measure 5/8” (15.9 mm) down from the top of the Counter Front on both ends and attach to the counter joists with four (S2) Wood Screws.

Tight to the Counter Back attach (2685) Counter Top to each counter joist with 4 (TS) Trim Screws. Attach counter side (5536) to the outside of the outside counter joists.

Tight to (2685) Counter Top and centred over the middle counter joists with ends flush to the outside edges attach two (2716) counter middle tops with four (TS) Trim Screws per board.

Attach (2685) Counter Top to (2756) Siding Assembly with 2 (TS) Trim Screws. Place Faucet and 2 Sink Knobs in opening of Sink and attach Sink Knobs with included hardware.

Place Sink and Stove in the openings of the Counter Assembly then attach 4 Mount Clips with included hardware to the bottom of the Sink and Stove to secure in place.

Important: Use a hand held screwdriver and DO NOT over tighten. Note: To remove the Sink or Stove loosen screw 1/4 turn then twist Mount Clips.


Cafe Canopy

Feed Cafe Canopy Frame through the pocket of the Cafe Canopy

With a helper hold the Canopy against the fort, on the Back Wall as shown on the Glee Fort Guide, measure 3-1/8” (79 mm) in from the outside edge of the (2770) End Post Left, making sure the Cafe Canopy is smooth and tight then attach to the post with 2 (S5) Pan Screws (with #8 flat washer), measure 1-1/2” (38.1mm) down from the first screw then attach a third screw and washer. Follow measurements as shown in fig. 18.2 for remaining screws and washers. Measurements must be exact.

Hold the Cafe Canopy Frame against the panel and attach with 1 (S6) Pan Screw per side.